Projects

Projects


GEDUNG LABORATORIUM ,FAKULTAS KEDOKTERAN UPN VETERAN JAKARTA


project gallery image

Project Name :
Gedung Laboratorium ,Fakultas Kedokteran UPN Veteran Jakarta

Contractor :
Arkindo-Galatama JO

Owner :
Universitas Pembangunan Nasional Veteran Jakarta (UPN)

Consultant :
PT Cipta Andalan Persada


Background :

To support UPN veterans' lecture facilities, build a new building for the medical faculty. This 8-story building will later be used for integrated laboratories, mini hospitals, hyperbaric laboratories, and lecture rooms.

Products and solutions :

With a project implementation schedule of only 270 days, the contractor intends to speed up structural work, one of which is by accelerating the process of floor casting. For this reason, concrete is needed that can reach the age of dismantling the formwork faster, so that the processing time on the floor above it can be faster without waiting for the age of the concrete to be up to 14 days. Daracem 133 from GCP is added to the concrete mix to speed up the process of achieving a shorter concrete life for the process of dismantling the formwork, so that it can be done more quickly to do the laying of the floor above it.

Copyright 2021 Kiluan Bangun Selaras.